Project Overview
Hope Ready-Mix supplied concrete to repair the CP rail lines that were washed away after the floods and mudslides of November 2021 in North Bend, just outside of Boston Bar BC.
Hope Ready-Mix supplied concrete to repair the CP rail lines that were washed away after the floods and mudslides of November 2021 in North Bend, just outside of Boston Bar BC.